Energy, Fratin ad Affaritaliani.it: “By 2030 the goal is to eliminate coal and oil”
“I think this is also a unique job opportunity for the Sicily, a way to put yourself at the center of a crossroads for Italy, because Sicily is Italy”. Of this he is convinced Minister of Environment and Energy SecurityGilberto Pichetto Fratinvisiting today at Catania on the occasion of the launch of the construction site of the Gigafactory 3Sun promoted by Enelwhich by 2024 will be there largest solar panel factory of Europe with a production capacity of 3GW all’anno.
L’hub which will arise in Sicily will completely change “what was the paradigm of the relationship we had with respect to energy: we had the energy that arrived from the East, then in central Europe and was sorted towards the South”, Fratin explained to Affaritaliani.it. “Today’s energy for Italy will be energy that will come from wind and photovoltaic energy with the aim of having at least two-thirds”, Fratin remarks.
The interview with Minister Fratin with Affaritaliani.it
“We currently consume at least 300 Terawatts a year, or 300 billion kilowatts: we need to get to 2030 to have at least 200 from renewablesessentially from photovoltaic, wind, geothermal and hydroelectric. A third will still be fossilbut that this is gas and no longer coal and oil: this is the goal we have”, remarked Fratin.
Two bars then on themeeting that took place today at Palazzo Chigi are energy and Pnrr. “The goal is to keep track of the progress of the national Pnrr with respect to the two years it was launched, and obviously today we are also going to include the Repower US: the new availabilities must be evaluated by a final projection to 2026”. Finally, Fratin clarifies that on Priolosite of the Isab refinery, recognized as being of national strategic interest, the government is working on a “Overall dpcm it’s a Ministerial Decree” which is “okay”.
Subscribe to the newsletter